The customary construction method for ceramic and basalt tiled low µ roads is to place tiles one by one by hand on the construction site.
Our new technology, a pre-cast method, is to make the reinforced concrete panels beforehand with tiles or pebbles laid on it in a factory.
Thus SKID PANEL constitutes a great advance in durability and flatness level.


